Smartraft® can be installed quickly and efficiently with minimal excavation or muck away.
Once a 200mm deep trench is excavated, Smartraft® is lifted directly into place, with the VRS crew installing the barrier system closely behind.
Smartraft® will have already reached the required concrete curing strength before its installed, so the system can be commissioned immediately after installation has been completed.
Advantages of Smartraft®
- No pre-site testing required, can be installed in any standard highway ground condition.
- Can be safely installed over and in close proximity to underground services and drainage systems whilst still
maintaining access. - Faster, more efficient and safer installation compared to conventional methods.
- Permanent or temporary solution.
- Compatible with proprietary systems, including Hill & Smith Single sided and double-sided systems and terminals.
- Compatible with non-proprietary systems (TCB & OBB) and terminals.
- Potential for no spoil removal being required as excavated material can be backfilled into the perforations.
- Minimal depth of excavation or ground preparation required (typical 200mm below carriageway level).
Smartraft® Case Studies
A320 Surrey Project
Client | Surrey City Council |
---|---|
Project Cost | £900,000.00 |
Services | Supply & Installation of Smartraft® and VRS |
Location | A320, Surrey |
Army & Navy Junction Smartraft® Case Study
Client | Henderson & Taylor, Essex Highways |
---|---|
Services | Smartraft®, VRS |
Start Date | 29th March 2021 |
End Date | 25th May 2021 |
Location | Army & Navy Junction, Chelmsford Essex |
A14 Jct 36 Entry Slip Road Smartraft® Repair
Client | Ringway |
---|---|
Services | Smartraft®, VRS |
Start Date | 5th July 2021 |
End Date | 5th July 2021 |
Location | A14 Jct 36 Slip Road |