Restore®
Home » Restore
Restore® is a revolutionary deformable concrete vehicle restraint system (VRS) that enhances highway safety through a unique combination of strength, flexibility, and sustainability. Engineered for performance, Restore® provides a robust solution for vehicle containment and energy absorption, effectively improving the limitations of traditional barriers.
By seamlessly integrating innovation, compliance, and environmental responsibility, Restore® redefines vehicle restraint systems. Featuring deformable concrete technology, an elevated design, and compatibility with modular foundations like Smartraft® * Hydroraft®, it delivers safety, efficiency, and sustainability for modern highway infrastructure.
With a modular design, Restore® is simple to maintain, repair, and replace. Its versatile construction allows installation on Smartraft® and Hydroraft® foundations or directly onto existing concrete bases, making it adaptable to a wide range of infrastructure requirements.
Interested in Smartraft®?
Fill in the form below and we will be in touch.
"*" indicates required fields
Smartraft® Case Studies

A320 Surrey Project
Client | Surrey City Council |
---|---|
Project Cost | £900,000.00 |
Services | Supply & Installation of Smartraft® and VRS |
Location | A320, Surrey |

Army & Navy Junction Smartraft® Case Study
Client | Henderson & Taylor, Essex Highways |
---|---|
Services | Smartraft®, VRS |
Start Date | 29th March 2021 |
End Date | 25th May 2021 |
Location | Army & Navy Junction, Chelmsford Essex |

A14 Jct 36 Entry Slip Road Smartraft® Repair
Client | Ringway |
---|---|
Services | Smartraft®, VRS |
Start Date | 5th July 2021 |
End Date | 5th July 2021 |
Location | A14 Jct 36 Slip Road |
Get in touch
Call us on 01638 666115 email info@smartraft.co.uk or contact us online.
Work Smarter not Harder with Smartraft®
Client Compliments
This scheme had challenged conventional approaches to barrier restraints. Working in collaboration with Arbus and Highways England, the team developed a really innovative approach that is already creating a safer environment for all. Arbus were innovative in their approach to designing this barrier solution and it was exciting to be involved following a long term relationships with the teams,
5
Mike Thompson, Divisional Manager – Ringway
Everything was great as always. A big thanks for all your help and efforts to get this project completed.
5
Kemal Bakici - Balfour Beatty
I thought I’d like to put out a BIG WELL DONE to all that have made a fantastic effort over the past few weeks to achieve where we are today on the A1 switch. Fantastic effort and collaboration from all those involved in making the switch go very smoothly and safely. It’s a pleasure to work with direct labour and sub-contractors who really care about safety and quality, and prove we can work in tight potentially dangerous areas by cordoning off their work sites to ensure plant pedestrian interface is maintained at all times and still get the job done on time. You are all a credit to your companies.
5
Senior General Foreman - A14 Integrated Delivery Team
Well done it looks a very good job, done in quick time and as promised. The TM was spot on.
5
Contracts Manager, Ringway.
Congratulations to everybody for the great achievement in opening the Swavesey westbound to traffic. This is even more special because we’ve done it on time hitting another one of our critical milestones. Thank you all.
5
Roadworks Manager (S4) - A14 Integrated Delivery Team
Hill & Smith are proud to have worked alongside Arbus to deliver the A14 flagship scheme; supplying all the Vehicle Restraint Systems for this project was a great achievement! Hill & Smith provided VRS technical support to the clients from the beginning which supported Arbus and wider A14 team in ensuring the project was successfully completed.
5
VRS Manufacturer, Hill & Smith