The Future of Highways Construction
Assets can share the same Smartraft® foundation, so only requiring one solution for multiple asset installations. This can greatly reduce the time required on site, network occupancy, traffic management, material requirements, waste and project costs. All the assets and their positions can be fully designed off site, allowing for a safe, quick and efficient installation on site.
Smartraft® has a full range of fixings options such as socketed and bolt down that can be assembled to the Smartraft® allowing for a variety of design options and solutions. Smartraft® can be made completely bespoke to suit all available assets, post type, fixing types, loadings and specific site requirements.
Other Roadside Features
As well as being the perfect solution for a VRS foundation, Smartraft®, also has the capability to facilitate a full range of existing or new road side features and highways assets that are required or present in the verge space. These are but not limited to:
- Lamp columns
- Signage
- Bollards
- Acoustic fencing
- Boundary/perimeter fencing
- Drainage features
- Lighting
- CCTV masts
- Telecoms/Phone boxes
Smartraft®
A320 Surrey Project
Client | Surrey City Council |
---|---|
Project Cost | £900,000.00 |
Services | Supply & Installation of Smartraft® and VRS |
Location | A320, Surrey |
Army & Navy Junction Smartraft® Case Study
Client | Henderson & Taylor, Essex Highways |
---|---|
Services | Smartraft®, VRS |
Start Date | 29th March 2021 |
End Date | 25th May 2021 |
Location | Army & Navy Junction, Chelmsford Essex |
A14 Jct 36 Entry Slip Road Smartraft® Repair
Client | Ringway |
---|---|
Services | Smartraft®, VRS |
Start Date | 5th July 2021 |
End Date | 5th July 2021 |
Location | A14 Jct 36 Slip Road |
Interested in Smartraft®?
Fill in the form below and we will be in touch.
"*" indicates required fields